Section titled “Risk-Based Testing Explained”Risk-based testing is TEA’s core principle: testing depth scales with business impact. Instead of testing everything equally, focus effort where failures hurt most.
Overview
Section titled “Overview”Traditional testing approaches treat all features equally:
- Every feature gets same test coverage
- Same level of scrutiny regardless of impact
- No systematic prioritization
- Testing becomes checkbox exercise
Risk-based testing asks:
- What’s the probability this will fail?
- What’s the impact if it does fail?
- How much testing is appropriate for this risk level?
Result: Testing effort matches business criticality.
The Problem
Section titled “The Problem”Equal Testing for Unequal Risk
Section titled “Equal Testing for Unequal Risk”Feature A: User login (critical path, millions of users)Feature B: Export to PDF (nice-to-have, rarely used)
Traditional approach:- Both get 10 tests- Both get same review scrutiny- Both take same development time
Problem: Wasting effort on low-impact features while under-testing critical paths.No Objective Prioritization
Section titled “No Objective Prioritization”PM: "We need more tests for checkout"QA: "How many tests?"PM: "I don't know... a lot?"QA: "How do we know when we have enough?"PM: "When it feels safe?"
Problem: Subjective decisions, no data, political debates.The Solution: Probability × Impact Scoring
Section titled “The Solution: Probability × Impact Scoring”Risk Score = Probability × Impact
Section titled “Risk Score = Probability × Impact”Probability (How likely to fail?)
- 1 (Low): Stable, well-tested, simple logic
- 2 (Medium): Moderate complexity, some unknowns
- 3 (High): Complex, untested, many edge cases
Impact (How bad if it fails?)
- 1 (Low): Minor inconvenience, few users affected
- 2 (Medium): Degraded experience, workarounds exist
- 3 (High): Critical path broken, business impact
Score Range: 1-9
Risk Scoring Matrix
Section titled “Risk Scoring Matrix”%%{init: {'theme':'base', 'themeVariables': { 'fontSize':'14px'}}}%%graph TD subgraph Matrix[" "] direction TB subgraph Impact3["Impact: HIGH (3)"] P1I3["Score: 3<br/>Low Risk"] P2I3["Score: 6<br/>HIGH RISK<br/>Mitigation Required"] P3I3["Score: 9<br/>CRITICAL<br/>Blocks Release"] end subgraph Impact2["Impact: MEDIUM (2)"] P1I2["Score: 2<br/>Low Risk"] P2I2["Score: 4<br/>Medium Risk"] P3I2["Score: 6<br/>HIGH RISK<br/>Mitigation Required"] end subgraph Impact1["Impact: LOW (1)"] P1I1["Score: 1<br/>Low Risk"] P2I1["Score: 2<br/>Low Risk"] P3I1["Score: 3<br/>Low Risk"] end end
Prob1["Probability: LOW (1)"] -.-> P1I1 Prob1 -.-> P1I2 Prob1 -.-> P1I3
Prob2["Probability: MEDIUM (2)"] -.-> P2I1 Prob2 -.-> P2I2 Prob2 -.-> P2I3
Prob3["Probability: HIGH (3)"] -.-> P3I1 Prob3 -.-> P3I2 Prob3 -.-> P3I3
style P3I3 fill:#f44336,stroke:#b71c1c,stroke-width:3px,color:#fff style P2I3 fill:#ff9800,stroke:#e65100,stroke-width:2px,color:#000 style P3I2 fill:#ff9800,stroke:#e65100,stroke-width:2px,color:#000 style P2I2 fill:#fff9c4,stroke:#f57f17,stroke-width:1px,color:#000 style P1I1 fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000 style P2I1 fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000 style P3I1 fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000 style P1I2 fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000 style P1I3 fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000Legend:
- 🔴 Red (Score 9): CRITICAL - Blocks release
- 🟠 Orange (Score 6-8): HIGH RISK - Mitigation required
- 🟡 Yellow (Score 4-5): MEDIUM - Mitigation recommended
- 🟢 Green (Score 1-3): LOW - Optional mitigation
Scoring Examples
Section titled “Scoring Examples”Score 9 (Critical):
Feature: Payment processingProbability: 3 (complex third-party integration)Impact: 3 (broken payments = lost revenue)Score: 3 × 3 = 9
Action: Extensive testing required- E2E tests for all payment flows- API tests for all payment scenarios- Error handling for all failure modes- Security testing for payment data- Load testing for high traffic- Monitoring and alertsScore 1 (Low):
Feature: Change profile theme colorProbability: 1 (simple UI toggle)Impact: 1 (cosmetic only)Score: 1 × 1 = 1
Action: Minimal testing- One E2E smoke test- Skip edge cases- No API tests neededScore 6 (Medium-High):
Feature: User profile editingProbability: 2 (moderate complexity)Impact: 3 (users can't update info)Score: 2 × 3 = 6
Action: Focused testing- E2E test for happy path- API tests for CRUD operations- Validation testing- Skip low-value edge casesHow It Works in TEA
Section titled “How It Works in TEA”1. Risk Categories
Section titled “1. Risk Categories”TEA assesses risk across 6 categories:
TECH - Technical debt, architecture fragility
Example: Migrating from REST to GraphQLProbability: 3 (major architectural change)Impact: 3 (affects all API consumers)Score: 9 - Extensive integration testing requiredSEC - Security vulnerabilities
Example: Adding OAuth integrationProbability: 2 (third-party dependency)Impact: 3 (auth breach = data exposure)Score: 6 - Security testing mandatoryPERF - Performance degradation
Example: Adding real-time notificationsProbability: 2 (WebSocket complexity)Impact: 2 (slower experience)Score: 4 - Load testing recommendedDATA - Data integrity, corruption
Example: Database migrationProbability: 2 (schema changes)Impact: 3 (data loss unacceptable)Score: 6 - Data validation tests requiredBUS - Business logic errors
Example: Discount calculationProbability: 2 (business rules complex)Impact: 3 (wrong prices = revenue loss)Score: 6 - Business logic tests mandatoryOPS - Operational issues
Example: Logging system updateProbability: 1 (straightforward)Impact: 2 (debugging harder without logs)Score: 2 - Basic smoke test sufficient2. Test Priorities (P0-P3)
Section titled “2. Test Priorities (P0-P3)”Risk scores inform test priorities (but aren’t the only factor):
P0 - Critical Path
- Risk Scores: Typically 6-9 (high risk)
- Other Factors: Revenue impact, security-critical, regulatory compliance, frequent usage
- Coverage Target: 100%
- Test Levels: E2E + API
- Example: Login, checkout, payment processing
P1 - High Value
- Risk Scores: Typically 4-6 (medium-high risk)
- Other Factors: Core user journeys, complex logic, integration points
- Coverage Target: 90%
- Test Levels: API + selective E2E
- Example: Profile editing, search, filters
P2 - Medium Value
- Risk Scores: Typically 2-4 (medium risk)
- Other Factors: Secondary features, admin functionality, reporting
- Coverage Target: 50%
- Test Levels: API happy path only
- Example: Export features, advanced settings
P3 - Low Value
- Risk Scores: Typically 1-2 (low risk)
- Other Factors: Rarely used, nice-to-have, cosmetic
- Coverage Target: 20% (smoke test)
- Test Levels: E2E smoke test only
- Example: Theme customization, experimental features
Note: Priorities consider risk scores plus business context (usage frequency, user impact, etc.). See Test Priorities Matrix for complete criteria.
3. Mitigation Plans
Section titled “3. Mitigation Plans”Scores ≥6 require documented mitigation:
## Risk Mitigation
**Risk:** Payment integration failure (Score: 9)
**Mitigation Plan:**- Create comprehensive test suite (20+ tests)- Add payment sandbox environment- Implement retry logic with idempotency- Add monitoring and alerts- Document rollback procedure
**Owner:** Backend team lead**Deadline:** Before production deployment**Status:** In progressGate Rules:
- Score = 9 (Critical): Mandatory FAIL - blocks release without mitigation
- Score 6-8 (High): Requires mitigation plan, becomes CONCERNS if incomplete
- Score 4-5 (Medium): Mitigation recommended but not required
- Score 1-3 (Low): No mitigation needed
Comparison: Traditional vs Risk-Based
Section titled “Comparison: Traditional vs Risk-Based”Traditional Approach
Section titled “Traditional Approach”// Test everything equallydescribe('User profile', () => { test('should display name'); test('should display email'); test('should display phone'); test('should display address'); test('should display bio'); test('should display avatar'); test('should display join date'); test('should display last login'); test('should display theme preference'); test('should display language preference'); // 10 tests for profile display (all equal priority)});Problems:
- Same effort for critical (name) vs trivial (theme)
- No guidance on what matters
- Wastes time on low-value tests
Risk-Based Approach
Section titled “Risk-Based Approach”// Test based on risk
describe('User profile - Critical (P0)', () => { test('should display name and email'); // Score: 9 (identity critical) test('should allow editing name and email'); test('should validate email format'); test('should prevent unauthorized edits'); // 4 focused tests on high-risk areas});
describe('User profile - High Value (P1)', () => { test('should upload avatar'); // Score: 6 (users care about this) test('should update bio'); // 2 tests for high-value features});
// P2: Theme preference - single smoke test// P3: Last login display - skip (read-only, low value)Benefits:
- 6 focused tests vs 10 unfocused tests
- Effort matches business impact
- Clear priorities guide development
- No wasted effort on trivial features
When to Use Risk-Based Testing
Section titled “When to Use Risk-Based Testing”Always Use For:
Section titled “Always Use For:”Enterprise projects:
- High stakes (revenue, compliance, security)
- Many features competing for test effort
- Need objective prioritization
Large codebases:
- Can’t test everything exhaustively
- Need to focus limited QA resources
- Want data-driven decisions
Regulated industries:
- Must justify testing decisions
- Auditors want risk assessments
- Compliance requires evidence
Consider Skipping For:
Section titled “Consider Skipping For:”Tiny projects:
- 5 features total
- Can test everything thoroughly
- Risk scoring is overhead
Prototypes:
- Throw-away code
- Speed over quality
- Learning experiments
Real-World Example
Section titled “Real-World Example”Scenario: E-Commerce Checkout Redesign
Section titled “Scenario: E-Commerce Checkout Redesign”Feature: Redesigning checkout flow from 5 steps to 3 steps
Risk Assessment:
| Component | Probability | Impact | Score | Priority | Testing |
|---|---|---|---|---|---|
| Payment processing | 3 | 3 | 9 | P0 | 15 E2E + 20 API tests |
| Order validation | 2 | 3 | 6 | P1 | 5 E2E + 10 API tests |
| Shipping calculation | 2 | 2 | 4 | P1 | 3 E2E + 8 API tests |
| Promo code validation | 2 | 2 | 4 | P1 | 2 E2E + 5 API tests |
| Gift message | 1 | 1 | 1 | P3 | 1 E2E smoke test |
Test Budget: 40 hours
Allocation:
- Payment (Score 9): 20 hours (50%)
- Order validation (Score 6): 8 hours (20%)
- Shipping (Score 4): 6 hours (15%)
- Promo codes (Score 4): 4 hours (10%)
- Gift message (Score 1): 2 hours (5%)
Result: 50% of effort on highest-risk feature (payment), proportional allocation for others.
Without Risk-Based Testing:
Section titled “Without Risk-Based Testing:”Equal allocation: 8 hours per component = wasted effort on gift message, under-testing payment.
Result: Payment bugs slip through (critical), perfect testing of gift message (trivial).
Mitigation Strategies by Risk Level
Section titled “Mitigation Strategies by Risk Level”Score 9: Mandatory Mitigation (Blocks Release)
Section titled “Score 9: Mandatory Mitigation (Blocks Release)”**Gate Impact:** FAIL - Cannot deploy without mitigation
**Actions:**- Comprehensive test suite (E2E, API, security)- Multiple test environments (dev, staging, prod-mirror)- Load testing and performance validation- Security audit and penetration testing- Monitoring and alerting- Rollback plan documented- On-call rotation assigned
**Cannot deploy until score is mitigated below 9.**Score 6-8: Required Mitigation (Gate: CONCERNS)
Section titled “Score 6-8: Required Mitigation (Gate: CONCERNS)”**Gate Impact:** CONCERNS - Can deploy with documented mitigation plan
**Actions:**- Targeted test suite (happy path + critical errors)- Test environment setup- Monitoring plan- Document mitigation and owners
**Can deploy with approved mitigation plan.**Score 4-5: Recommended Mitigation
Section titled “Score 4-5: Recommended Mitigation”**Gate Impact:** Advisory - Does not affect gate decision
**Actions:**- Basic test coverage- Standard monitoring- Document known limitations
**Can deploy, mitigation recommended but not required.**Score 1-3: Optional Mitigation
Section titled “Score 1-3: Optional Mitigation”**Gate Impact:** None
**Actions:**- Smoke test if desired- Feature flag for easy disable (optional)
**Can deploy without mitigation.**Technical Implementation
Section titled “Technical Implementation”For detailed risk governance patterns, see the knowledge base:
Risk Scoring Matrix
Section titled “Risk Scoring Matrix”TEA uses this framework in test-design:
Impact 1 2 3 ┌────┬────┬────┐ 1 │ 1 │ 2 │ 3 │ Low riskP 2 │ 2 │ 4 │ 6 │ Medium riskr 3 │ 3 │ 6 │ 9 │ High risko └────┴────┴────┘b Low Med HighGate Decision Rules
Section titled “Gate Decision Rules”| Score | Mitigation Required | Gate Impact |
|---|---|---|
| 9 | Mandatory, blocks release | FAIL if no mitigation |
| 6-8 | Required, documented plan | CONCERNS if incomplete |
| 4-5 | Recommended | Advisory only |
| 1-3 | Optional | No impact |
Gate Decision Flow
Section titled “Gate Decision Flow”%%{init: {'theme':'base', 'themeVariables': { 'fontSize':'14px'}}}%%flowchart TD Start([Risk Assessment]) --> Score{Risk Score?}
Score -->|Score = 9| Critical[CRITICAL RISK<br/>Score: 9] Score -->|Score 6-8| High[HIGH RISK<br/>Score: 6-8] Score -->|Score 4-5| Medium[MEDIUM RISK<br/>Score: 4-5] Score -->|Score 1-3| Low[LOW RISK<br/>Score: 1-3]
Critical --> HasMit9{Mitigation<br/>Plan?} HasMit9 -->|Yes| Concerns9[CONCERNS ⚠️<br/>Can deploy with plan] HasMit9 -->|No| Fail[FAIL ❌<br/>Blocks release]
High --> HasMit6{Mitigation<br/>Plan?} HasMit6 -->|Yes| Pass6[PASS ✅<br/>or CONCERNS ⚠️] HasMit6 -->|No| Concerns6[CONCERNS ⚠️<br/>Document plan needed]
Medium --> Advisory[Advisory Only<br/>No gate impact] Low --> NoAction[No Action<br/>Proceed]
style Critical fill:#f44336,stroke:#b71c1c,stroke-width:3px,color:#fff style Fail fill:#d32f2f,stroke:#b71c1c,stroke-width:3px,color:#fff style High fill:#ff9800,stroke:#e65100,stroke-width:2px,color:#000 style Concerns9 fill:#ffc107,stroke:#f57f17,stroke-width:2px,color:#000 style Concerns6 fill:#ffc107,stroke:#f57f17,stroke-width:2px,color:#000 style Pass6 fill:#4caf50,stroke:#1b5e20,stroke-width:2px,color:#fff style Medium fill:#fff9c4,stroke:#f57f17,stroke-width:1px,color:#000 style Low fill:#c8e6c9,stroke:#2e7d32,stroke-width:1px,color:#000 style Advisory fill:#e8f5e9,stroke:#2e7d32,stroke-width:1px,color:#000 style NoAction fill:#e8f5e9,stroke:#2e7d32,stroke-width:1px,color:#000Common Misconceptions
Section titled “Common Misconceptions””Risk-based = Less Testing”
Section titled “”Risk-based = Less Testing””Wrong: Risk-based testing often means MORE testing where it matters.
Example:
- Traditional: 50 tests spread equally
- Risk-based: 70 tests focused on P0/P1 (more total, better allocated)
“Low Priority = Skip Testing”
Section titled ““Low Priority = Skip Testing””Wrong: P3 still gets smoke tests.
Correct:
- P3: Smoke test (feature works at all)
- P2: Happy path (feature works correctly)
- P1: Happy path + errors
- P0: Comprehensive (all scenarios)
“Risk Scores Are Permanent”
Section titled ““Risk Scores Are Permanent””Wrong: Risk changes over time.
Correct:
- Initial launch: Payment is Score 9 (untested integration)
- After 6 months: Payment is Score 6 (proven in production)
- Re-assess risk quarterly
Related Concepts
Section titled “Related Concepts”Core TEA Concepts:
- Test Quality Standards - Quality complements risk assessment
- Engagement Models - When risk-based testing matters most
- Knowledge Base System - How risk patterns are loaded
Technical Patterns:
- Fixture Architecture - Building risk-appropriate test infrastructure
- Network-First Patterns - Quality patterns for high-risk features
Overview:
- TEA Overview - Risk assessment in TEA lifecycle
- Testing as Engineering - Design philosophy
Practical Guides
Section titled “Practical Guides”Workflow Guides:
- How to Run Test Design - Apply risk scoring
- How to Run Trace - Gate decisions based on risk
- How to Run NFR Assessment - NFR risk assessment
Use-Case Guides:
- Running TEA for Enterprise - Enterprise risk management
Reference
Section titled “Reference”- TEA Command Reference -
test-design,nfr-assess,trace - Knowledge Base Index - Risk governance fragments
- Glossary - Risk-based testing term
Generated with BMad Method - TEA (Test Architect)